New Brunswick’s energy regulator approves 500
New Brunswick’s energy regulator has approved a Crown corporation’s application for a 500-Megawatt natural gas plant.
NB Power says it needs the project to meet a sharp increase in power demand by 2028.
The corporation has a 25-year contract with Missouri-based ProEnergy to set up 10 natural gas turbines in a rural area in the province’s southeast.
NB Power says the proposed plant will help serve as a backstop when weather-dependent renewable power sources are not available.
It says the combustion turbines — which can switch to diesel when required — will be mixed in with batteries, wind and solar to create an overall cleaner grid.
Nova Scotia’s energy operator has signed a 10-year agreement to purchase 100 Megawatts of power from the future plant.
The project still requires approval following an ongoing provincial environmental impact assessment.
Related Stories
World
Bayonne, N.J., takes on Iowa in Little League World Series
29 minutes ago
World
Russia withdraws ambassador to UK as Kremlin ratchets pressure over Ukraine support
29 minutes ago
World
Trump will kick off the IndyCar race in the Beast before cars zoom through Washington's streets
29 minutes ago
World
Robots compete in boxing, football and sprinting at World Humanoid Games
1 hour ago
World
Chinese humanoid robot beats Bolt's 100
1 hour ago
World
Video. Latest news bulletin | August 23rd, 2026
1 hour ago
World
Latest news bulletin | August 23rd, 2026
1 hour ago
World
Naraoka in History
2 hours ago